Project Title: Capacity Building Project for Climate-Responsive Power Plant Energy Management in Bataan, Philippines (2025–2029)

Acerca de
<Summary>
Internship Period: February 2025 – August 2025
Internship Format: Weekly online team meetings, with assignments completed and submitted online
Internship Location: Jiwon Tech, Suwon, Gyeonggi-do
I. Motivation for Applying to the Internship
Having long been deeply interested in climate and the environment, I grew up wondering how to reduce the enormous volumes of pollutants and carbon dioxide generated by large-scale infrastructure such as power plants.
Nuclear energy carries inherent risks, yet some emerging advanced economies — including France, China, and South Korea — are pouring energy into developing renewable energy as a green eco-business. Meanwhile, developing countries that remain heavily under the influence of powers like the United States, or that lack their own growth momentum, continue to rely on fossil fuels such as oil and coal. Confronting this reality led me to the conviction that developing nations face an urgent need not merely to adapt to climate change, but to actively mitigate it.
It was around that time that my father mentioned a domestic company holding a patent for removing scale from the chimneys of Korean thermal power plants — and that this company was preparing to launch a project in the Philippines under the product name Scale Sniper, aimed at removing scale buildup inside industrial stacks. The moment I heard this, I felt a strong desire to get involved, and I worked up the courage to apply for an internship.
Jiwon Tech has its office in Suwon, so I visited almost as a trial interview. When I mentioned that I thought I could help with creating materials in English, the team leader was visibly pleased.
The company specializes in diagnosing and removing rust (scale) that accumulates inside the chimneys and pipes of power plants, and providing solutions to address it. They also perform semiconductor cleaning, which has brought major corporate clients such as Samsung Electronics and POSCO on board, and they have markets overseas as well.
The company is currently providing consulting services to San Miguel Corporation — the largest conglomerate in Manila, Philippines — aimed at improving power generation efficiency. The Philippines, a country highly vulnerable to climate change, is actively pursuing large-scale national infrastructure policies centered on energy efficiency. However, due to limited funding, the country seeks to bridge the gap through foreign direct investment and official development assistance (ODA).
According to the company, one of the greatest challenges for small and medium-sized enterprises (SMEs) expanding overseas is the upfront cost of initial establishment. The Korean government operates several programs to support such overseas expansion, one of which is a Public-Private Partnership (PPP) scheme. Under this program, once a company enters a new market and commits a certain level of investment, the government reviews the project and injects additional public funds — enabling the company to gain a competitive edge over foreign governments and businesses.
Jiwon Tech was in the early stages of piloting a government subsidy initiative this year and was in need of research support. As someone interested in carbon-neutral solutions, my role primarily involved online literature reviews, preparing presentation decks, and translating materials into English — work I was able to carry out remotely, submitting assignments after school or on weekends.
II. Key Roles and Responsibilities During the Internship
My primary responsibility was to prepare English-language presentation materials — based on the company's domestic and international business performance, research achievements, and patent-related reports — for use in English-language meetings held in the Philippines. To do this effectively, I needed to understand the company's business operations and gain familiarity with the chemicals used in the scale removal process inside chimneys, which required a foundational knowledge of chemistry. It was genuinely rewarding to learn for the first time how science and technology are applied in real-world business settings, and because I have a passion for chemistry, I was able to study and engage with the work enthusiastically.
Detailed analysis follows below.


-
Implementing Agency: Jiwon Tech Co., Ltd.
(Consultant: Donut Consulting Inc.)
-
Cooperating Organizations:
-KOICA (Korea International Cooperation Agency),
-Department of Science and Technology (DOST),
-Philippine Society of Mechanical Engineers (PSME),
-Roma Italia Resources
-Pristine Energy Transfer Corp. (PETC)
-
Project Budget: 2.747 billion KRW (approx. 2 million USD)
-
Duration: 2025–2029 (4 years)
1. Background and Rationale
The province of Bataan in the Philippines is a strategic energy hub where several thermal and coal-based power plants are concentrated. Despite its importance, the province suffers from outdated energy infrastructure, inefficient plant management, and environmental challenges due to scale formation and fossil fuel dependence.
This project addresses the growing demand for enhanced energy efficiency and carbon reduction technologies in the power generation sector by introducing Korean-made energy efficiency solutions and technical capacity building.
2. Project Objective
To strengthen the energy management capacity of small and medium-sized power plants in Bataan through the deployment of scale-removal solutions, operator training, and community awareness programs, thereby contributing to national climate change mitigation goals and the SDG 7.3 target.
3. Key Activities
-
Deployment of Energy Efficiency Solutions:
Scale-removal and heat exchange enhancement technologies will be introduced at selected power plants using Jiwon Tech’s AFC and HRSG repair solutions. -
Capacity-Building Training Programs:
Two 1-week training modules will be implemented: (1) Climate-Responsive Power Plant Operations, and (2) Preventive Maintenance and Post-Project Technical Management. -
Community Climate Action Campaign:
Awareness-raising workshops and campaigns for local government officials, plant managers, and citizens to promote sustainable energy use and behavior change. -
Monitoring and Evaluation:
Establishment of a real-time energy efficiency and CO₂ reduction monitoring system based on an MRV framework, including baseline, mid-term, and endline surveys.
4. Expected Outputs & Outcomes
-
Energy efficiency technology applied at 3–5 power facilities.
-
Training of at least 50 local engineers and technicians
-
Distribution of 2-year maintenance packages and SOP manuals
-
3 public campaigns and workshops conducted in Bataan.≥25% improvement in plant-level energy efficiency
-
Increased awareness and behavior change among plant staff and local residents.
-
Enhanced local ownership through institutional capacity development.
-
Strengthened carbon reduction infrastructure aligned with the Philippines' NDC
5. Innovation and Sustainability
Jiwon Tech’s approach differs from existing donor-funded infrastructure projects by integrating:
-
Real-time performance monitoring (EMS & KPI dashboard)
-
Inclusive business strategies engaging local ESCOs and technical institutes
-
Post-project revenue model through technical support services and local partnerships
-
Localization of maintenance capacity through knowledge transfer and SOP documentation (ISO 50001-based)
6. Contribution to SDGs and Climate Action
The project directly supports:
-
SDG 7.3: Improving energy efficiency
-
SDG 13: Strengthening climate action and mitigation
-
SDG 9.4: Sustainable industrial upgrading
In addition, the project strengthens local governance and public-private cooperation mechanisms, as emphasized in the Philippines' NDC implementation strategy.
7. Post-Project Strategy and ROI Potential
Upon project completion, Jiwon Tech will sustain operations by:
-
Launching localized service centers in partnership with local ESCOs
-
Providing paid maintenance consulting packages
-
Expanding business to adjacent provinces (e.g., Zambales, Pampanga) through public procurement and DOST cooperation
Projected revenue post-2029 is based on B2B technical service models and the expansion of scale-removal technologies in Southeast Asia.